Integrated delivery methods allow for efficiency and reduced timeline.
Location: Springfield, MO
The 63,245-square-foot building is wood-framed with metal trusses along with stone and EIFS exterior cladding. Snyder Construction Group, as the general contractor in Springfield, Missouri, worked closely with the design team and owner to generate significant cost savings, expedited the construction timeline with panelized wall systems and coordinated seamlessly with the owner's procurement team for extensive FF&E and owner procured items. The trusted and valued integrated delivery method allowed this developer to be operational quicker than a standard design-bid-build method. This kind of success has led to multiple projects with this developer.
This project is LEED Gold certified.